A *Product missing goBIM subscription* is:
* Chemical products – a product connected to a product type, for which a subscription is required, owned by a manufacturer that is not a SDS maker client;
* Non-chemical products – a product connected to a product type, for which a subscription is required, owned by a manufacturer that is not a goBIM client;
*Restrictions*:
* Include only registered, not deleted workplaces. Deleted workplaces will not be billed, even if they are deleted in the current billing period;
* Archive workplaces will be billed if they are archived in the current billing period i.e. the last invoice will be send in the month, the workplace is archived (Is Archived flag = true);
* We also need to bill all workplaces whose planned end date (Workplace ESTIMATED End Date) is in the current billing period. This will be done in case the company never actually archives their WP (Is Archived flag = true);
* If a contractor adds the product/SDS, the contractor will be billed;
* If a contractor invites a sub-contractor and the sub-contractor adds a product/SDS, only the sub-contractor will be billed;
* If a (sub)contractor invites a wholesaler and the wholesaler adds a product/SDS the (sub)contractor will be billed, not the wholesaler;
* We will bill on a workplace level;
* If a product is used on more than one workplace of the same company, we will bill them for each workplace;